From:                              route@monster.com

Sent:                               Saturday, April 16, 2016 2:04 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: NSN Construction Manager

 

This resume has been forwarded to you at the request of Monster User xapeix03

Travis Sharpe 

Last updated:  03/22/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Walland, TN  37886
US

sharpey607@gmail.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Travis Sharpe - Field Manager

Resume Value: 8em4ri4tn6e5pvkz   

  

 

 

 

Travis M. Sharpe

5050 Old Walland Hwy. Walland, TN 37886

(682)888-6660

sharpey607@gmail.com

 

CAREER OBJECTIVE:

A position as a Area manager or within the Engineering field. 

 

EDUCATION:

ITT-Tech - Associate of Electrical Engineering Technology

 

 

SKILLS:

·         15 years experience in Central office zones 1-4,Outside plant, Commercial & Residential post & pre construction ,Cellular sites, AC & DC Power -Tyco, Marconi, Lorain, Emerson, PECO II, Valere Power & Adtran systems.

·         Labeling software from Brady, P- touch, Panduit on a daily basis.

·         Share point, Excel, Word, power point, outlook

·         Excellent Knowledge of customer’s standards (Telecordia,Verizon, At&t, Qwest(Century Link)

·         Tellabs 5500-1024-2048-3072, 6500, 532l, 256e, 7200, 8860, 3100, Fujitsu Flashwave 4100,4500, Nortel DMS 100,500 switches, Succession, Cinea, Geomax, Spirent, Dantel , D –max, Motorola, Alcatel, Cisco CRS 8/16, Nexus 7K & 9k, Brocade, Lucent, Nokia, Red Back, Westell, Hyper-edge, Juniper MX-960 systems & Info Blox, F5, Cisco server & router systems.

 

 

CERTIFICATIONS:

·         AC/DC Electrical Theory and Application

·         Power Plants and Systems

·         Central Office Bonding & Grounding Policy

·         Battery Technologies for Telecommunications Equipment Locations

·         Performing DC "Hot" Cutover Procedures (An examination of the Detailed Method of Procedure)

·         OSHA

·         ATS Bar Code & Scanning

·         LCC & BNC 

·         Hilti & 3M Fire Stop Systems

·         Hilti Powder Actuated Tools

·         Dantel Alarm Systems

·         Fibercom Fiber splicing

·         Central Office Equipment Engineering Drawing Symbols

·         Central Office Installation Workmanship Assessment Competency Aptitude

·         At&t - Premise Technician  

·         At&t – Ask yourself

·         At&t – supplier awareness

·         At&t – Quality Installations

·         At&t – Best method

·         At&t – Fiber cleaning

·         At&t – Fiber  handling

 

 

 

 

WORK HISTORY:

 

 

 

GDT

1/12-Present

Field Manager & Field Engineer (level 4)

 

Engineered and Installed Cisco CRS VE & PE, Nexus 7K & 9K’s.Preformed upgrades on 8 slot CRS’s and preformed live traffic cut over’s & Installed Brocade equipment, performed migrations of Juniper and Cisco equipment. Ran power from batteries to BDFB’s, Ran, stitched, terminated, torque & marked cables power from relay rack’s to BDFB’s, tested and fused all. Worked with Customer and Supplier on a Daily basis, basic Installation, Following and writing of Spec’s & MOP’s, Running & forming of DS1, DS3, CAT5 & Fiber optic cables, connection of All Cables, fiber splicing, preformed (T-Berd, MT 5000, Voltage, Amp) test on all cables & System turn up

 

 

Telamon Inc.

1/10-1/11

Lead Foreman & Field Engineer (Level 4)

 

Engineered and ordered material for equipment, Ran, stitched, terminated torque & marked cables to panels and return bar. Ran power from batteries to BDFB’s, Ran, stitched, terminated, torque & marked cables power from relay rack’s to BDFB’s, tested and fused all. Completed At&t electronic folders, worked with software such as share point, e-time, tee-fit word excel, citrix and outlook. Received work orders from AT&T, performed site surveys, ordered materials, installed jobs, test and turn up, performed quality audits on all AT&T Riser customer prem. sites Worked with Customer and Supplier on a Daily basis, basic Installation, Following and writing of Spec’s & MOP’s, Running & forming of DS1, DS3, CAT5 & Fiber optic cables, connection of All Cables, fiber splicing, preformed (T-Berd, MT 5000, Voltage, Amp) test on all cables & System turn up of Cisco switches and routers

 

 

 

TechForce

1/09- 1/10

Area Supervisor (Level 4)

 

Ran, stitched, terminated, torque & marked cables power from battery’s to BDFB’s. Ran, stitched & terminated power from relay rack’s to BDFB’s, tested and fused all. Received work orders from AT&T, performed site surveys, ordered materials, installed jobs, test and turn up, performed quality audits on all AT&T Riser customer prems. Worked with Customer and Supplier on a Daily basis, basic Installation Following Spec’s & MOP’s, Running & forming of DS1, DS3, CAT5 & Fiber optic cables, connection of All Cables, fiber splicing, preformed (T-Berd, MT 5000, Voltage, Amp) test on all cables & System turn up. Hung cable support brackets, Ran Voice, Data & Speaker Cable from rooms to IDF & MDF's Formed and Terminated Jacks & Patch Panels. 

 

 

 

 

 

 

 

Alamon Inc.

11/07- 1/09 

Lead Installer (Level 4)

 

Worked side by side with Qwest on Installation, Removal, and Trouble shooting of Tellabs, Nortel, Alcatel, Fujitsu, Cisco switches and routers along with Fiber to the node projects. All work consist of basic Installation following Spec’s & MOP’s, Running & forming of DS1, DS3, CAT5, Power & Fiber optic cables, connection of All Cables, Labeling & Testing of all cables and equipment. Engineered and ordered material for equipment, Ran, stitched, terminated torque & marked cables to panels and return bar. Ran power from batteries to BDFB’s, Ran, stitched, terminated, torque & marked cables power from relay rack’s to BDFB’s, tested and fused all.

 

Pride Communications

8/06-11/07 (contract ended)

Lead Installer (Level 4)

 

Fiber splicing, Test and turn up of Nortel SPME, Tellabs HD 5500 Motorola Fiber to the node projects and Ditech  shelf’s Worked with Customer and Supplier on a Daily basis, basic Installation  Following Spec’s & MOP’s, Running & forming of DS1, DS3, CAT5, Power & Fiber optic cables, connection of All Cables. 

 

PIVOTEL, LLC

7/99-08/06

Area Supervisor (Level 4)

 

Worked with Customer and Supplier on a Daily basis, basic Installation Following Spec’s & MOP’s, Running & forming of DS1, DS3, CAT5 & Fiber optic cables, connection of All Cables, fiber splicing, preformed (T-Berd, MT 5000, Voltage, Amp) test on all cables & System turn up & trouble shooting Management of Installation crews on sites, prepared all MOP’S (Power, Critical, General, Detailed) for all Customers, prepared all paperwork for Customer, Supplier and Vendor’s during and at the end of all jobs, performed Quality Audits on all jobs, preformed tests on various Tellabs equipment, Fujitsu, Spirent and Dantel equipment. Engineered and ordered material for equipment, performed migrations of Cisco and juniper equipment. Ran, stitched, terminated torque & marked cables to panels and return bar. Ran power from batteries to BDFB’s, Ran, stitched, terminated, torque & marked cables power from relay rack’s to BDFB’s, tested and fused all.

  

REFERENCES:

Doug Curto – AT & T LNS/Area Manager – 602-617-3260

Frank Figueroa- Qwest/Q.T.I (Century Link) Field Supervisor – 520-292-7021   

Len Thumma- Qwest/Q.T.I (Century Link) – 520-861-9377     

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Field Manager

GDT

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Student (Undergraduate/Graduate)

 

 

Target Job:

Target Job Title:

Field Manager

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TN-Knoxville